When will a design firm be selected?

A:

The engineering firm Mott MacDonald was selected in December 2015 to perform preliminary (30%) design for the streetcar project. The preliminary design was completed in the spring of 2017. The Request for Proposal for final (100%) design is anticipated to be complete in Fall 2017.